Question

Painters in the Sports Hall

A7 · C2 · D1 · 10 marks · ~10 min
✦ Created by our AI question engine · answers checked by script Self-marked 0 / 9
How this page works Full help
  1. Read the question and the information above the parts.
  2. Write your working and your answer in the box for each part, with units, as in the exam. Press Enter for a new line.
  3. Check your final line with Check my answer. Use the calculator on the right when you need it.
  4. Mark yourself: open the markscheme and tick each mark you earned.

A school is repainting the walls of its sports hall over the summer. The site manager, Mr Haddad, assumes that all painters work at the same speed, so the time $t$ hours the job takes is inversely proportional to the number of painters $n$.

With 6 painters the job takes 15 hours.

425.1
A1 Level 1–2
[1]Select the equation that matches Mr Haddad's assumption, where $k$ is a constant.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 1 mark

Model answer

Inversely proportional means t = k ÷ n: doubling the number of painters halves the time.
t = k/n

Mark yourself

425.2
A2 Level 3–4
[2]Find the value of $k$.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 2 marks

Model answer

15 = k ÷ 6, so k = 15 × 6 = 90.
k = 90

Mark yourself

425.3
A2 Level 3–4
[2]Calculate how long the job would take with 9 painters.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 2 marks

Model answer

t = 90 ÷ 9 = 10 hours
10 hours

Mark yourself

425.4
A2 · C1 Level 5–6
[3]The hall must be finished in at most 4 hours on the last day of the holiday. Find the smallest number of painters needed.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 3 marks

Model answer

4 = 90 ÷ n gives n = 22.5. 22 painters take 90 ÷ 22 ≈ 4.09 hours (too long); 23 painters take 90 ÷ 23 ≈ 3.91 hours. So 23 painters.
23 painters

Mark yourself

Key idea. When the answer must be a whole number, check which way to round in the context.

425.5
C1 · D1 Level 5–6
[2]Explain why the model is unlikely to be accurate for a very large number of painters, such as 200.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 2 marks

Model answer

The model gives 90 ÷ 200 = 0.45 hours, about 27 minutes. In practice there would not be enough wall space or ladders for 200 painters, they would get in each other's way, and each coat of paint still needs time to dry, so the job could not be done that quickly.
For example: 200 painters would get in each other's way and there would not be enough space or equipment.

Mark yourself

Solves
0
Average rating
–
Open reports
0

Assessment criteria

A
Knowing and understanding
B
Investigating patterns
C
Communicating
D
Applying mathematics in real-life contexts

Quality checks

  • Created by our AI question engine
  • Every number checked by script
  • Published for students