Sign in
United Kingdom › MYP Mathematics › Statistics & probability
Question

Coffee Shop Waiting Times

A1 · C1 · D9 · 11 marks · ~12 min
✦ Created by our AI question engine · answers checked by script Self-marked 0 / 9
How this page works Full help
  1. Read the question and the information above the parts.
  2. Write your working and your answer in the box for each part, with units, as in the exam. Press Enter for a new line.
  3. Check your final line with Check my answer. Use the calculator on the right when you need it.
  4. Mark yourself: open the markscheme and tick each mark you earned.

A coffee shop in Leeds sets itself two targets for the lunchtime rush:

  • the mean time a customer waits for their drink should be no more than 4 minutes;
  • no more than 20% of customers should wait more than 6 minutes.

The manager, Aisha, times 50 customers one lunchtime. Her results, $w$ minutes, are:

Waiting time, $w$ (minutes)Number of customers
$0 < w \le 2$9
$2 < w \le 4$16
$4 < w \le 6$13
$6 < w \le 8$8
$8 < w \le 10$4
724.1
D1 Level 1–2
[1]Write down how many of the customers waited more than 4 minutes.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 1 mark

Model answer

13 + 8 + 4 = 25 customers
25 customers

Mark yourself

724.2
A1 · D2 Level 3–4
[3]Calculate an estimate of the mean waiting time. Give your answer to 2 decimal places.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 3 marks

Model answer

Midpoints 1, 3, 5, 7, 9. Σfx = 9 + 48 + 65 + 56 + 36 = 214. Estimated mean = 214 ÷ 50 = 4.28 minutes.
4.28 minutes

Mark yourself

724.3
C1 · D2 Level 5–6
[3]Calculate the percentage of these customers who waited more than 6 minutes, and determine whether the coffee shop met its second target.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 3 marks

Model answer

8 + 4 = 12 customers waited more than 6 minutes. 12 ÷ 50 × 100 = 24%. This is more than 20%, so the second target was not met.
24%; the second target was not met.

Mark yourself

724.4
D2 Level 5–6
[2]Aisha says: "Your answer to 724.2 is only an estimate, so it might give the wrong decision about the first target." Explain why she could be right, using your method in 724.2.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 2 marks

Model answer

The estimate of 4.28 minutes is just over the 4-minute target, but it is only an estimate, because each customer's time was replaced by the midpoint of their class. If most of the times in each class were near the lower end of the class, the real mean could be below 4 minutes.
The 4.28 uses midpoints, not the actual times; if times were mostly near the bottom of each class the true mean could be under 4.

Mark yourself

724.5
D2 Level 7–8
[2]Aisha wants to be more confident about whether the coffee shop meets its targets. Describe one improvement to how she collects or records the data, and explain why it helps.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 2 marks

Model answer

She should time customers on several different days, not just one lunchtime, so the results are more representative. Recording each exact time would also let her find the true mean rather than an estimate.
For example: time customers on several days, or record exact times instead of classes.

Mark yourself

Solves
0
Average rating
–
Open reports
0

Assessment criteria

A
Knowing and understanding
B
Investigating patterns
C
Communicating
D
Applying mathematics in real-life contexts

Quality checks

  • Created by our AI question engine
  • Every number checked by script
  • Published for students