Sign in
United Kingdom › MYP Mathematics › Statistics & probability
Question

Lunch Delivery Times

A5 · C1 · D3 · 9 marks · ~11 min
✦ Created by our AI question engine · answers checked by script Self-marked 0 / 9
How this page works Full help
  1. Read the question and the information above the parts.
  2. Write your working and your answer in the box for each part, with units, as in the exam. Press Enter for a new line.
  3. Check your final line with Check my answer. Use the calculator on the right when you need it.
  4. Mark yourself: open the markscheme and tick each mark you earned.

Folasade organises working lunches for a small architects' office in Leeds. She can order sandwiches from two delivery firms, Pedal Post (Firm A) or ZoomEats (Firm B). For 11 orders with each firm she noted how many minutes passed between placing the order and the food reaching the office. She showed the results in a back-to-back stem-and-leaf diagram.

Firm A leavesStemFirm B leaves
17 9
8 7 5 5 4 221 3 4 6 6 9
5 4 3 1 038
45
51

Key: Firm A leaf 2 on stem 2 means 22 minutes; stem 2 with Firm B leaf 1 means 21 minutes. Firm A leaves are read from right to left.

751.1
A1 Level 1–2
[1]Write down the longest delivery time for Firm B.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 1 mark

Model answer

Stem 5, leaf 1 on the Firm B side: 51 minutes.
51 minutes

Mark yourself

751.2
A2 Level 3–4
[2]Find the median delivery time for Firm A.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 2 marks

Model answer

Firm A in order: 22, 24, 25, 25, 27, 28, 30, 31, 33, 34, 35. The median is the 6th value: 28 minutes.
28 minutes

Mark yourself

751.3
A1 Level 3–4
[1]Find the median delivery time for Firm B.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 1 mark

Model answer

Firm B in order: 17, 19, 21, 23, 24, 26, 26, 29, 38, 45, 51. The 6th value is 26 minutes.
26 minutes

Mark yourself

751.4
A1 · D1 Level 5–6
[2]Meetings start 35 minutes after Folasade orders the food. Calculate the percentage of Firm B deliveries that took more than 35 minutes. Give your answer to 1 decimal place.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 2 marks

Model answer

Firm B deliveries over 35 minutes: 38, 45, 51, so 3 out of 11. 3 ÷ 11 × 100 = 27.27…% ≈ 27.3%.
27.3%

Mark yourself

751.5
C1 · D2 Level 7–8
[3]Compare the two firms using your medians and the range of each firm's times. Justify which firm Folasade should use so that the food arrives before the meeting starts.
Checks your final line. Mark a different line with ★ if your answer is not the last line.
Markscheme · 3 marks

Model answer

Folasade should use Firm A. Its median is only 2 minutes longer (28 against 26 minutes), but its range is 13 minutes against 34 minutes for Firm B, so its times are far more consistent, and every Firm A delivery arrived within 35 minutes. About 27% of Firm B deliveries took longer than 35 minutes, so the food would often be late.
Firm A: more consistent (range 13 minutes against 34) and never over 35 minutes.

Mark yourself

Solves
0
Average rating
–
Open reports
0

Assessment criteria

A
Knowing and understanding
B
Investigating patterns
C
Communicating
D
Applying mathematics in real-life contexts

Quality checks

  • Created by our AI question engine
  • Every number checked by script
  • Published for students